Time stepping: CFL, physical time, and dual-time status

Purpose and evidence boundary

This page is a living source-trace and verification memorandum for the current time-stepping implementation. It records what the checked-in source does, the mathematical relationships needed to reason about it, known verification gaps, and the tests/cases that should be added later.

An implementation declaration is not a verification result. A linked test declaration is not evidence that the test was built or executed. A passing regression comparison is not, by itself, independent numerical validation. The maturity of each claim must remain explicit.

Recommended evidence levels:

  • implemented: a source path exists;

  • unit-tested: an isolated policy or numerical kernel has executed tests;

  • integration-tested: the connected runtime path has executed tests;

  • numerically verified: results have been compared with an analytical or independently computed reference, with error behavior assessed;

  • case-validated: a representative CFD case has been run and assessed;

  • regression-tested: a previously accepted result is reproduced within a declared comparison policy.

These levels are complementary, not interchangeable.

CFL schedule

The parameters cflst, cfled, and ncfl define a CFL schedule for the unstructured Navier-Stokes time-step path. They do not directly specify a physical time increment.

Iteration::Init reads the three values from the runtime parameter database. UTimeStep::CalcTimeStep calls CalcCfl() before selecting the CPU or supported HIP path. The optional idualtime parameter is loaded into Iteration::dualtime (default zero for older parameter files). TimeStep::CalcCfl selects outerSteps for physical-time stepping and innerSteps when idualtime == 1.

The pure schedule is

\[\begin{split}\mathrm{CFL}(i) = \begin{cases} \mathrm{CFL}_{start} + (\mathrm{CFL}_{end}-\mathrm{CFL}_{start})\,i/n_{CFL}, & i < n_{CFL}, \\ \mathrm{CFL}_{end}, & i \ge n_{CFL}. \end{cases}\end{split}\]

The initial iteration uses cflst, the ramp reaches cfled at ncfl, and later iterations retain the end value. The current code does not validate a positive ramp length or constrain either CFL value. A zero ramp length selects the end value for non-negative iteration indices.

From CFL to cell time step

For the CPU local-step branch, the inviscid cell estimate is

\[\Delta t_{inv,c} = \frac{\mathrm{CFL}\,V_c}{\lambda_{inv,c}}.\]

When the viscous time-step contribution is enabled, the estimates are combined as

\[\Delta t_c = \frac{\Delta t_{inv,c}\,\Delta t_{vis,c}} {\Delta t_{inv,c}+\Delta t_{vis,c}}.\]

The spectral radii are assembled from face contributions. The viscous contribution depends on the selected viscous spectral-radius model and is only included when a viscous model and visTimeStepModel enable it. The local path also applies max_time_ratio as an upper cap relative to the minimum local step when that ratio is positive.

Time-step model dispatch

The current unstructured NS path in UTimeStep::CalcTimeStep has three branches:

  • timestepModel == 0: retain per-cell local time steps.

  • timestepModel == 1: fill cells with ctrl.pdt, initialized from global_dt. This branch does not derive the step from the CFL ramp.

  • Other values: compute local steps, find the minimum, fill all cells with that minimum, and update ctrl.pdt. Checked-in case comments label value 2 as the local-global mode; the implementation’s final else branch is broader than that documented value.

The supported HIP fast path is currently gated to local time stepping (timestepModel == 0) and computes the inviscid local step. Do not interpret it as evidence that the HIP path has the CPU viscous combination.

Physical-time accumulation and stopping

Ctrl::Init initializes ctrl.pdt from global_dt and sets ctrl.currTime to zero. It also seeds ctrl.pdt1 = ctrl.pdt for the first history-dependent calculation.

In the audited MG::Run implementation, ctrl.currTime += ctrl.pdt is the physical-time accumulator update. Its placement depends on startStrategy:

  • For startStrategy == 2 or 3, the increment occurs inside the inner loop before SolveInnerIter; both outerSteps and innerSteps are incremented there.

  • In the other branch, the increment occurs once per outer-loop pass before the inner convergence loop.

SimuIterState::Running chooses the stop condition: outerSteps >= maxSteps when iexitflag == 0; otherwise currTime >= maxTime. Since the time increment occurs before the next outer-loop running check, the audited path does not show a final-step clip to maxTime. The actual accumulation cadence is therefore coupled to startStrategy and should not be generalized to every solver without tracing its run loop.

This is a source observation, not a statement that either cadence is numerically correct for every configuration. In particular, the increment before the solve raises questions about rejected, interrupted, or non-converged physical steps. These need explicit lifecycle tests before changing the behavior.

Physical time, pseudo time, and history intervals

Use distinct notation for the physical interval and the pseudo-time iteration:

  • (t^n): accepted physical time at level (n);

  • (Delta t_n = t^{n+1}-t^n): current physical interval;

  • (Delta t_{n-1}): previous accepted physical interval;

  • (tau): pseudo-time used to converge the current physical level.

For a variable-step method, define the interval ratio

\[r_n = \frac{\Delta t_n}{\Delta t_{n-1}}.\]

For reference, the variable-step BDF2 derivative is

\[\left.\frac{dQ}{dt}\right|_{n+1} \approx \frac{1}{\Delta t_n} \left[ \frac{1+2r_n}{1+r_n}Q^{n+1} -(1+r_n)Q^n +\frac{r_n^2}{1+r_n}Q^{n-1} \right].\]

This formula is included as a mathematical reference for history-dependent integration. It is not a claim that every linearTwoStepMethods selector currently implements this variable-step BDF2 formula. The exact mapping from the legacy coefficient table to each method must be derived and independently checked before assigning formal order or stability properties.

A generic dual-time residual equation can be written as

\[\frac{\partial Q}{\partial \tau} + \frac{\alpha_0 Q^{n+1} +\alpha_1 Q^n +\alpha_2 Q^{n-1}}{\Delta t_n} + R(Q^{n+1}) = 0.\]

The pseudo-time iteration solves for the current physical level. Advancing (tau) is not the same operation as accepting another physical time level. A correct lifecycle must define when the physical solution and its history are committed, and must not rotate physical history on every pseudo-time or multigrid smoothing iteration.

Previous-step interval bootstrap and remaining lifecycle gap

Ctrl::Init seeds ctrl.pdt1 = ctrl.pdt immediately after loading global_dt. This gives the first history-dependent unsteady calculation a nonzero previous-step interval when the configured step is valid. TimeIntegration::CalcSrcCoeff uses

\[sc_1 = \frac{bsc_1}{\Delta t_n}, \qquad sc_3 = \frac{bsc_3}{\Delta t_{n-1}}, \qquad sc_2 = -sc_1-sc_3,\]

with the current implementation represented by ctrl.pdt and ctrl.pdt1.

This is only an initialization seed. The audited source tree has no subsequent assignment that shifts the accepted current interval into pdt1 when pdt changes. In particular, UTimeStep::CalcLgTimeStep can replace pdt with the minimum local step, while the history interval remains unchanged. The startup seed removes the zero-initialized interval; it does not complete variable-step history management.

Known risks and questions to retain

The following are tracked verification gaps, not all confirmed numerical failures. They must remain visible until a test or source change resolves them.

  1. History rotation: there is no explicit accepted-physical-step operation that advances pdt1 to the prior accepted pdt. A changing step can therefore make the history coefficient use a stale interval.

  2. Time-step ownership: local-global time-step selection writes ctrl.pdt. It is not yet established that every consumer sees a consistent current interval or that history is captured at the correct boundary.

  3. Physical-time acceptance: MG::Run increments currTime before SolveInnerIter in the audited paths. Failure, early exit, divergence, or cancellation may leave time and solution state out of sync unless another layer restores or rejects the step.

  4. Dual-time evidence: idualtime currently affects CFL iteration indexing, and history-dependent spectrum/source paths exist, but this is not evidence of an end-to-end dual-time solver lifecycle.

  5. Pseudo-time convergence: residual thresholds, maximum pseudo-time iterations, multigrid cycles, and the physical-step acceptance condition need separate definitions and tests.

  6. Startup method: multistep methods require a defined first-step bootstrap. The current initialization of pdt1 alone does not prove that the solution history required by every method is initialized consistently.

  7. Invalid intervals: divisions by pdt and pdt1 require finite positive intervals. The relevant parameter and runtime validation boundaries have not yet been established.

  8. Final-time handling: the audited loop does not show clipping the last physical interval to maxTime - currTime. Overshoot behavior should be tested and specified rather than assumed.

  9. Strategy dependence: the two MG::Run branches use different counter and time-accumulation cadences. Other solver paths may differ and require their own call-chain audit.

  10. CPU/HIP equivalence: the supported HIP local-step path currently does not establish equivalence with the CPU viscous contribution.

Verification backlog

The work should be added incrementally as real solver paths and representative cases become available. Do not mark these items verified merely because the contract or test declaration has been added.

Unit and policy tests:

  • finite-positive interval validation, including zero, negative, NaN, and infinity;

  • fixed-step history bootstrap and constant-step history rotation;

  • variable-step history rotation and interval-ratio coefficient evaluation;

  • startup behavior for each supported time-integration method;

  • CFL schedule selection for physical-time and dual-time modes;

  • stopping-time and final-interval clipping policy.

Runtime lifecycle and integration tests:

  • one physical step with an observable accepted/rejected outcome;

  • multiple physical steps with changing (Delta t_n);

  • pseudo-time iteration that does not advance physical time per inner iteration;

  • multigrid smoothing/cycles that do not rotate physical history;

  • early convergence, maximum-iteration exit, divergence, and cancellation;

  • both audited startStrategy branches;

  • local, global, and local-global time-step models;

  • CPU/HIP parity for configurations claimed to be supported.

Numerical verification and case validation:

  • manufactured time-dependent solution with known temporal error;

  • constant-step temporal refinement and observed order;

  • variable-step temporal refinement with controlled interval ratios;

  • a dual-time benchmark with independently checked residual and physical time histories;

  • at least one unsteady compressible and one unsteady incompressible representative case, when their runtime paths are ready;

  • comparison of physical observables, not only residual convergence.

For each numerical result, retain the governing equation, initial and boundary conditions, mesh/time-step parameters, solver configuration, reference solution, error norm, observed convergence rate, command, revision, and artifacts. A regression baseline should be labelled as reproducibility evidence unless it is independently tied to a numerical reference.

Source map

  • Parameter loading: Iteration::Init in codes/global/src/Iteration.cpp

  • Iteration selection and CFL policy call: TimeStep::CalcCfl in codes/ns/src/TimeStep.cpp

  • Pure interpolation: CflAtIteration in codes/ns/src/TimeStepPolicy.cpp

  • Time-step model dispatch and cell assembly: UTimeStep::CalcTimeStep in codes/uns/src/UTimeStep.cpp

  • Fixed/global step input: Ctrl::Init in codes/global/src/Ctrl.cpp and the solver-specific control initializers

  • Physical-time loop: MG::Run in codes/multigrid/src/Multigrid.cpp

  • History-dependent coefficients: TimeIntegration::CalcSrcCoeff in codes/unsteady/src/TimeIntegration.cpp

  • Dual-time spectrum consumers: UNsSpectrum.cpp, UINsSpectrum.cpp, and UTurbSpectrum.cpp

  • Existing CFL policy tests: tests/solver/timestep_policy_test.cpp

  • Existing parameter contract: parameter/cfl-ramp

What this proves / does not prove

Proves: source-level parameter loading, iteration-counter selection, linear interpolation, dual-time iteration-index selection, pure-policy test declarations, current unstructured NS time-step dispatch, and the formulas documented above as implementation/reference relationships.

Does not prove: that every linked test has run; that every solver uses this path; that variable-step history is rotated correctly; that dual-time integration is exercised end-to-end; that a configured CFL is stable for a given mesh/flow; that the selected time integrator has its claimed formal order; or that a case reaches a converged or accurate solution. Units and nondimensional interpretation of global_dt remain case/solver dependent.

Evolution policy

This memorandum is intentionally allowed to contain unresolved items. As refactoring and case coverage expand, each item should move through explicit states such as observed, test_planned, test_declared, executed, numerically_verified, and resolved. Keep the original observation and link the resolving commit and evidence; do not erase the history when implementation changes.